Document steam availability dashboard and relief venting
This commit is contained in:
2
TODO.md
2
TODO.md
@@ -13,3 +13,5 @@
|
||||
- Update turbine power mapping to consume steam enthalpy/quality and align protection trips with real steam presence; drive inlet steam around 6–7 MPa, quality/enthalpy-based flow to ~550–600 MW(e) per machine class if steam is available.
|
||||
- Add integration test: cold start → gens/pumps 2/2 → ramp to ~3 GW → confirm steam quality threshold at the secondary drum → enable all turbines and require electrical output. Include a step that tolerates one secondary pump off for a period to prove redundancy still yields steam.
|
||||
- [x] Dashboard follow-ups: replace turbine “Steam P” with a more useful steam availability signal (enthalpy × steam flow).
|
||||
- [x] Relief modeling: vent both loops gradually to ~1 MPa when reliefs are open, removing steam enthalpy/mass and capping pump targets to prevent instant repressurization.
|
||||
- [x] Dashboard follow-ups: replace turbine “Steam P” with a more useful steam availability signal (enthalpy × steam flow).
|
||||
|
||||