Revert schematic to metrics view and park F2 plan
This commit is contained in:
6
TODO.md
6
TODO.md
@@ -7,11 +7,7 @@
|
||||
- [ ] Introduce CHF/DNB margin, clad/fuel split temps, and SCRAM matrix for subcooling loss or SG level/pressure trips.
|
||||
- [ ] Flesh out condenser behavior: vacuum pump limits, cooling water temperature coupling, and dynamic back-pressure with fouling.
|
||||
- [ ] Dashboard polish: compact turbine/generator rows, color critical warnings (SCRAM/heat-sink), and reduce repeated log noise.
|
||||
- [ ] Dashboard multi-page view (F1/F2):
|
||||
- F1 retains current numeric layout.
|
||||
- F2 adds an ASCII schematic of the plant (core, primary pumps/pressurizer/HX, secondary pumps/drum, turbines/gens/consumer, reliefs/condenser) with inline key values (flows, pressures, steam quality/enthalpy, MW) and simple animations for flow/status.
|
||||
- Add page indicator/status hint and size checks; keep updates performant (prebuilt template, minimal redraws).
|
||||
- Optional: color-coded states (RUN/START/CAV/RELIEF) and blinking for alarms.
|
||||
- [ ] Dashboard multi-page view (F1/F2): retain numeric view on F1; future F2 schematic should mirror real PWR layout with ASCII art, flow/relief status, and minimal animations; add help/status hints and size checks; keep perf sane.
|
||||
- [ ] Incremental realism plan:
|
||||
- Add stored enthalpy for primary/secondary loops and a steam-drum mass/energy balance (sensible + latent) while keeping existing pump logic and tests passing. Target representative PWR conditions: primary 15–16 MPa, 290–320 °C inlet/320–330 °C outlet, secondary saturation ~6–7 MPa with boil at ~490–510 K.
|
||||
- Adjust HX/pressure handling to use stored energy (saturation clamp and pressure rise) and validate steam formation with both pumps at ~3 GW. Use realistic tube-side material assumptions (Inconel 690/SS cladding) and clamp steam quality to phase-equilibrium enthalpy.
|
||||
|
||||
Reference in New Issue
Block a user