- [x] Pressurizer behavior, primary/secondary inventory and level effects, and pump NPSH/cavitation checks. - [x] Pressurizer behavior, primary/secondary inventory and level effects, and pump NPSH/cavitation checks.
- [x] Model feedwater/steam-drum mass-energy balance, turbine throttle/efficiency maps, and condenser back-pressure. - [x] Model feedwater/steam-drum mass-energy balance, turbine throttle/efficiency maps, and condenser back-pressure.
- [ ] Introduce CHF/DNB margin, clad/fuel split temps, and SCRAM matrix for subcooling loss or SG level/pressure trips. - [ ] Introduce CHF/DNB margin, clad/fuel split temps, and SCRAM matrix for subcooling loss or SG level/pressure trips.
- [ ] Flesh out condenser behavior: vacuum pump limits, cooling water temperature coupling, and dynamic back-pressure with fouling. - [x] Flesh out condenser behavior: vacuum pump limits, cooling water temperature coupling, and dynamic back-pressure with fouling.
- [ ] Dashboard polish: compact turbine/generator rows, color critical warnings (SCRAM/heat-sink), and reduce repeated log noise. - [ ] Dashboard polish: compact turbine/generator rows, color critical warnings (SCRAM/heat-sink), and reduce repeated log noise.
- [ ] Dashboard multi-page view (F1/F2): retain numeric view on F1; future F2 schematic should mirror real PWR layout with ASCII art, flow/relief status, and minimal animations; add help/status hints and size checks; keep perf sane. - [ ] Dashboard multi-page view (F1/F2): retain numeric view on F1; future F2 schematic should mirror real PWR layout with ASCII art, flow/relief status, and minimal animations; add help/status hints and size checks; keep perf sane.
- [ ] Incremental realism plan: - [ ] Incremental realism plan:
@@ -15,4 +15,3 @@
- [x] Add integration test: cold start → gens/pumps 2/2 → ramp to ~3 GW → confirm steam quality threshold at the secondary drum → enable all turbines and require electrical output. Include a step that tolerates one secondary pump off for a period to prove redundancy still yields steam. - [x] Add integration test: cold start → gens/pumps 2/2 → ramp to ~3 GW → confirm steam quality threshold at the secondary drum → enable all turbines and require electrical output. Include a step that tolerates one secondary pump off for a period to prove redundancy still yields steam.
- [x] Dashboard follow-ups: replace turbine “Steam P” with a more useful steam availability signal (enthalpy × steam flow). - [x] Dashboard follow-ups: replace turbine “Steam P” with a more useful steam availability signal (enthalpy × steam flow).
- [x] Relief modeling: vent both loops gradually to ~1 MPa when reliefs are open, removing steam enthalpy/mass and capping pump targets to prevent instant repressurization. - [x] Relief modeling: vent both loops gradually to ~1 MPa when reliefs are open, removing steam enthalpy/mass and capping pump targets to prevent instant repressurization.