Add future realism tasks to TODO
This commit is contained in:
6
TODO.md
6
TODO.md
@@ -8,6 +8,12 @@
|
||||
- [x] Flesh out condenser behavior: vacuum pump limits, cooling water temperature coupling, and dynamic back-pressure with fouling.
|
||||
- [ ] Dashboard polish: compact turbine/generator rows, color critical warnings (SCRAM/heat-sink), and reduce repeated log noise.
|
||||
- [ ] Dashboard multi-page view (F1/F2): retain numeric view on F1; future F2 schematic should mirror real PWR layout with ASCII art, flow/relief status, and minimal animations; add help/status hints and size checks; keep perf sane.
|
||||
- [ ] Core thermal realism: add a simple radial fuel model (pellet/rim/clad temps) with burnup-driven conductivity drop and gap conductance; upgrade CHF/DNB correlation (e.g., Groeneveld/Chen) parameterized by pressure, mass flux, and quality, then calibrate margins.
|
||||
- [ ] Transient protection ladder: add dP/dt and dT/dt trips for SG overfill/depressurization and rod-run-in alarms; implement graded warn/arm/trip stages surfaced on the dashboard.
|
||||
- [ ] Chemistry & fouling: track dissolved oxygen/boron and corrosion/fouling that degrade HX efficiency and condenser vacuum; let feedwater temperature/chemistry affect steam purity/back-pressure.
|
||||
- [ ] Balance-of-plant dynamics: steam-drum level controller with shrink/swell, feedwater valve model, turbine throttle governor/overspeed trip, and improved load-follow tied to grid demand ramps.
|
||||
- [ ] Component wear & maintenance: make wear depend on duty cycle and off-nominal conditions (cavitation, high ΔP, high temp); add preventive maintenance scheduling and show next-due in the dashboard.
|
||||
- [ ] Scenarios & tooling: presets for cold start, load-follow, and fault injection (pump fail, relief stuck) with seedable randomness; snapshot diff tooling to compare saved states.
|
||||
- [ ] Incremental realism plan:
|
||||
- [x] Add stored enthalpy for primary/secondary loops and a steam-drum mass/energy balance (sensible + latent) while keeping existing pump logic and tests passing. Target representative PWR conditions: primary 15–16 MPa, 290–320 °C inlet/320–330 °C outlet, secondary saturation ~6–7 MPa with boil at ~490–510 K.
|
||||
- [x] Adjust HX/pressure handling to use stored energy (saturation clamp and pressure rise) and validate steam formation with both pumps at ~3 GW. Use realistic tube-side material assumptions (Inconel 690/SS cladding) and clamp steam quality to phase-equilibrium enthalpy.
|
||||
|
||||
Reference in New Issue
Block a user