Add enthalpy tracking and dashboard metrics

This commit is contained in:
Codex Agent
2025-11-25 20:23:25 +01:00
parent 3cb72f7ff0
commit 327fca7096
9 changed files with 124 additions and 61 deletions

View File

@@ -12,3 +12,4 @@
- Adjust HX/pressure handling to use stored energy (saturation clamp and pressure rise) and validate steam formation with both pumps at ~3 GW. Use realistic tube-side material assumptions (Inconel 690/SS cladding) and clamp steam quality to phase-equilibrium enthalpy.
- Update turbine power mapping to consume steam enthalpy/quality and align protection trips with real steam presence; drive inlet steam around 67 MPa, quality/enthalpy-based flow to ~550600 MW(e) per machine class if steam is available.
- Add integration test: cold start → gens/pumps 2/2 → ramp to ~3 GW → confirm steam quality threshold at the secondary drum → enable all turbines and require electrical output. Include a step that tolerates one secondary pump off for a period to prove redundancy still yields steam.
- [ ] Dashboard follow-ups: clarify or replace turbine “Steam P” field (currently shows loop pressure, not turbine-driving steam); consider removing it if no better signal is available.